Office & Commercial MoversAcross Washington State
Cubicles, servers, conference rooms, and full-floor relocations — moved evenings and weekends so your business doesn't miss a beat.
$500
Small Office From
24/7
Scheduling
IT
Coordination
20+
WA Cities
Office Move Sizes & Costs
Every office move is different. Here's what to expect based on your size.
Small Office (1–10 Employees)
$500–$2,000Includes: Desks, chairs, file cabinets, computers, small server
Timeline: 1 day
Usually completed in a single evening or weekend. Minimal disruption — your team can be working in the new space Monday morning.
Mid-Size Office (10–50 Employees)
$2,000–$8,000Includes: Cubicle systems, conference tables, copiers, server rack, kitchen/break room
Timeline: 1–3 days
Requires pre-move planning: labeling systems, floor plans at the new space, IT coordination. Most mid-size moves happen over a long weekend.
Large Office / Full Floor (50+ Employees)
$8,000–$30,000+Includes: Modular furniture systems, multiple server rooms, executive suites, common areas
Timeline: 3–10 days
Phased moves are common — moving one department at a time to maintain partial operations. Requires a dedicated project manager, detailed floor plans, and IT cut-over coordination.
Warehouse / Industrial
$5,000–$25,000+Includes: Shelving, inventory, heavy equipment, pallet racking
Timeline: 2–7 days
Requires forklifts, pallet jacks, and crews experienced with industrial equipment. Inventory management during the move is critical — count before and after.
What's Included
Commercial movers handle more than just carrying boxes.
Furniture & Cubicle Systems
Disassembly, transport, and reassembly of modular cubicle systems, standing desks, conference tables, and executive furniture. Labeled and placed according to your new floor plan.
IT Equipment & Servers
Coordinated disconnect, anti-static packing, climate-controlled transport, and reconnection of servers, network equipment, and workstations. We work with your IT team or MSP.
File & Records Management
Secure transport of file cabinets, banker's boxes, and sensitive records. Chain-of-custody documentation available for regulated industries (legal, medical, financial).
Specialty Equipment
Safes, copiers (200–500 lbs), lab equipment, medical devices, and industrial machinery. Specialized dollies, crating, and rigging as needed.
Evening & Weekend Moves
Most office moves happen outside business hours to minimize downtime. Our movers work evenings, overnight, and weekends — your team walks into a ready office the next business day.
Storage & Staging
Short-term storage for overflow furniture, seasonal inventory, or phased moves where the new space isn't fully ready. Climate-controlled options available for sensitive equipment.
Office Move Planning Timeline
8–12 Weeks Before
- Assemble move committee and assign a project lead
- Get moving quotes — compare 2–3 commercial movers
- Create a new office floor plan with furniture placement
- Inventory all furniture, equipment, and files
4–8 Weeks Before
- Book your mover and confirm the move schedule
- Coordinate IT disconnect/reconnect plan
- Order new furniture for the new space (if needed)
- Notify clients, vendors, and service providers of your new address
2–4 Weeks Before
- Label everything — color-coded by department and destination room
- Purge old files, broken furniture, and outdated equipment
- Update business address: USPS, bank, insurance, licenses, Google Business Profile
- Distribute move instructions to all employees
1 Week Before
- Confirm elevator reservations and loading dock access at both buildings
- Back up all servers and workstations
- Pack personal desk items — provide boxes to employees
- Final walkthrough of the new space to confirm readiness
Move Day(s)
- IT disconnects and packs servers first (or last, depending on cut-over plan)
- Movers load by department in reverse floor plan order
- At new space: verify placement against floor plan before the crew leaves
- IT reconnects and tests critical systems before the next business day
Office Moving FAQ
How much does it cost to move an office in Washington?
How long does an office move take?
Can you move us over a weekend to avoid downtime?
Who handles the IT equipment during the move?
Do office movers disassemble and reassemble cubicles?
How do I keep sensitive files secure during the move?
Should employees pack their own desks?
What about our lease obligations at the old space?
Get Your Office Move Quoted
Tell us your office size, move date, and any special equipment. We'll match you with commercial movers who minimize your downtime.
